We worked with a fixture manufacturer to help them streamline their part of the process starting with the pick, pack, and ship through the in-store department update. The result was a nearly 40% labor savings! Click on the case study below to read more about it.
![](https://hamacher.com/wp-content/uploads/2019/02/Case-Study-Operations-Efficiencies-Thumbnail-239x300.png)